-
Your shopping cart is empty!
EVM 16GB 3200MHz CL19 DDR4 RAM
Bank Credit & Debit Card EMI Offer


- Brand: EVM
- Product Code: EVMT16G3200U88P
- Availability: In Stock
EVM 16GB 3200MHz CL19 DDR4 RAM
Offer Price
₹9,295
(52% off ) ₹19,388
Free Delivery
Check
Delivery is guaranteed as long as our locations stay open according to government regulations.
Features:
- Capacity: 16GB
- DRAM Type: DDR4
- Form Factor: DDR4 LongDimm
- Part Number: EVMT16G3200U88P
- Memory Architecture: Synchronous DRAM
- Frequency(Speed): 3200 MHZ
- CAS Latency: CL19(3200)
- RAM Compatible with: Desktop
- Buffered RAM: No
- Memory Layout (Modules x size): 133.35*31.25*2.7mm (+/-0.12mm)
- Operating Temperature: 0 C to 85 C
- Storage Temperature: -55 C to +100 C
- Voltage: 1.2 Voltage
- Pins: 288 PIN
- Module Configuration: 64bit
- Row Cycle Time (Nanosecond): 45.75ns(min.)
- Refresh Row Cycle Time(Nanosecond): 350ns(min.)
| Memory-(Ram) | |
| Model | EVMT16G3200U88P |
| Memory Type | DDR4 |
| Capacity | 16GB |
| Kit Type | 16GB x 1 |
| Speed | 3200 MHz |
| Tested Latency | 19 |
| Tested Voltage | 1.2 V |
| Dimm Type | UDIMM |
| Warranty | 10 Years |
| Note | Features, Price, Specifications are subject to change without notice. Images used for representation purpose only |












